Reminiscing a bit. **Picture Heavy**
#11
-- SITE DONATOR --
True Car Nut
Thread Starter
I did a large portion of the work. The only parts I didn't do were the fiberglass boxes built into the doors for the front speakers, the modification of the tweeter mounts, the construction of the box for the sub (very unique, ill have to look for pictures), and the construction of the trunk panels. My friend that was helping with that stuff also wired up the second battery for me while he was back there. The tear down, sound deadening, wire running, head unit installation (lots of dash was lost to the dremel) and the mundane parts of the fiberglassing (tapeing, wiring, etc.) Was all me.
We spent many months planning and designing, overall the project took about a year, 6 months of that I was driving my truck while the car was in the shop as we tried different things and test fitted.
We spent many months planning and designing, overall the project took about a year, 6 months of that I was driving my truck while the car was in the shop as we tried different things and test fitted.
Thread
Thread Starter
Forum
Replies
Last Post
94 olds vert
Your Ride: GM Pictures & Videos
23
08-15-2012 09:36 PM